HOME
»
School Construction
(216 Slides)
[Page 13 of 15]
::
Jump To
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
2005-06-19 Ina Sue puts on the finishing touches
2005-06-30 Installing the ceiling in the gym
2005-07-14 Bro. Lloyd installed the bathroom cabinets
2005-07-14 Jonas Mast has some of the toilets in
2005-07-14 Ralph D. finishing some shelf boards
2005-07-14 Ralph helped me a lot on the shelves
2005-07-23 Bro. Lloyd put a solid surface counter on his cabinets
2005-07-23 Leon Yoder installed the roll up doors in the lab
2005-07-23 Looking more finished
2005-07-23 Shelves in progress
2005-07-26 Leon & Ralph both helped the last evening
2005-07-26 Posing with our Finished Shelves
2005-07-26 The finished project
2005-08-01 Hendrick helping with the lowly work
2005-08-01 The finishing crew
BluPlusPlus skin for
JAlbum 4.6
created by
Armond Avanes
Album last updated on 12/1/05 8:36 PM